Topic Details
Topic 1
  • Designing and Implementing a Data Centre: In this module, the exam assesses the knowledge of Exin data center professionals tasked with the design and implementation of data centers. Candidates will learn the key principles of creating an efficient data center layout, including considerations for scalability, redundancy, and security.
Topic 2
  • Data Centre Life Cycle and Standards: This section of the exam measures the skills of data center professionals and covers the various stages involved in the life cycle of a data center, from planning and design to implementation and decommissioning.
Topic 3
  • Data Centre Environmental Considerations and Efficiency: This section evaluates the proficiency of data center professionals in addressing environmental factors and promoting efficiency within data center operations. The target audience, including data center managers and engineers, will be tested on their ability to identify and implement measures that enhance energy efficiency, cooling management, and sustainable practices.

 

NEW QUESTION 31
What indicates the breaking capacity of a fuse or breaker?

 
 
 
 

NEW QUESTION 32
Which standard defines the requirements for network administration?

 
 
 
 

NEW QUESTION 33
What is the floor loading requirement for a Rated-3 data center according to ANSI/TIA-942?

 
 
 
 

NEW QUESTION 34
What is the first step in the design stage of the data center life cycle?

 
 
 
 

NEW QUESTION 35
You are allowed to use a calculator for this question. The total power consumption of the ICT equipment in a rack is 6 kW. The equipment is traditional ICT equipment with a Delta-T of approximately 11 °C / 20 °F. Calculate the approximate CFM required to cool the equipment in the rack.

 
 
 
 

NEW QUESTION 36
The ‘maximum exposed area’ of the fire-rated glass is defined by the supplier as 3 sqm/32 sqft. The window area is 4 sqm/43 sqft.
What would be the best option?

 
 
 
 

NEW QUESTION 37
You are allowed to use a calculator for this question. A battery bank is rated at a total capacity of 600 Ah.
Calculate how much charging current the rectifier should be able to supply as charging current.

 
 
 
 

NEW QUESTION 38
A computer room with raised floor and hot/cold aisles is designed. What is the minimum required distance between the air-conditioner outlet and the first rack?

 
 
 
 

NEW QUESTION 39
A data center scores Rated-3 in mechanical, Rated-4 in electrical, and Rated-2 in telecommunications. What is the overall rating?

 
 
 
 

NEW QUESTION 40
When designing a data center network, your company wants to minimize the number of network switches to manage.
What type of physical cabling layout would be the best choice?

 
 
 
 

NEW QUESTION 41
Do all residual current devices (RCDs) use the same operating principle?

 
 
 
 

NEW QUESTION 42
Three data centers are benchmarked on facilities energy efficiency.
Data center A has achieved a PUE of 2.45.
Data center B has achieved a PUE of 1.20.
Data center C has achieved a PUE of 1.90.
Which of the data centers is operating at the highest facility efficiency?

 
 
 
 

NEW QUESTION 43
You are allowed to use a calculator for this question.
A computer room has a net volume of approximately 2,500 m³ / 88,287 ft³.
The temperature is 20 °C / 68 °F.
The required design concentration is 7%.
The S-Factor is 0.1359 (metric) / 1.885 (imperial).
Calculate the amount of gas required for this computer room based on FM200. What is the correct weight?

 
 
 
 

NEW QUESTION 44
Where should raised-floor installation start?

 
 
 
 

NEW QUESTION 45
What is forced entry resistance based on?

 
 
 
 

NEW QUESTION 46
What is a significant difference between a halocarbon gas-based fire suppression system and an inert gas-based fire suppression system?

 
 
 
 

NEW QUESTION 47
Is it allowed to make design changes during the implementation phase?

 
 
 
 

NEW QUESTION 48
You are working on the design of a new facility. The electrical riser of the building with high current power is located close to the area where sensitive IT equipment in the computer room will be located.
What should you recommend to reduce the amount of EMF coming from the electrical riser?

 
 
 
 

NEW QUESTION 49
What is the risk of high levels of hydrogen sulfide (H#S) in the computer room?

 
 
 
 

NEW QUESTION 50
What is the calculation for the desired attenuation factor for shielding material?

 
 
 
 
 

NEW QUESTION 51
The building in which the computer room is housed is required to have a sprinkler system. The building is therefore equipped with a wet pipe system.
What action, if any, should you recommend for the computer room?

 
 
 
 

Latest EXIN CDCS Practice Test Questions: https://www.dumptorrent.com/CDCS-braindumps-torrent.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Related Posts

Achieve The Utmost Performance In PR2F Exam Pass Guaranteed [Q104-Q121]

Achieve The Utmost Performance In PR2F Exam Pass Guaranteed Achive your Success with Latest EXIN PR2F Exam The PRINCE2 7 Foundation written Exam certification exam is ideal…

Latest Exin-CDCP Pass Guaranteed Exam Dumps Certification Sample Questions [Q11-Q27]

Latest Exin-CDCP Pass Guaranteed Exam Dumps Certification Sample Questions New Exin-CDCP Test Materials & Valid Exin-CDCP Test Engine Having a certification in EXIN Exin-CDCP demonstrates that the…

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below